critical path of irradiation

critical path of irradiation
droga krytyczna

English-Polish dictionary for engineers. 2013.

Игры ⚽ Поможем написать реферат

Look at other dictionaries:

  • radiation — radiational, adj. /ray dee ay sheuhn/, n. 1. Physics. a. the process in which energy is emitted as particles or waves. b. the complete process in which energy is emitted by one body, transmitted through an intervening medium or space, and… …   Universalium

  • Agriculture and Food Supplies — ▪ 2007 Introduction Bird flu reached Europe and Africa, and concerns over BSE continued to disrupt trade in beef. An international vault for seeds was under construction on an Arctic island. Stocks of important food fish species were reported… …   Universalium

  • Neutron Capture Therapy of Cancer — Neutron Capture Therapy (NCT) is a noninvasive therapeutic modality for treating locally invasive malignant tumors such as primary brain tumors and recurrent head and neck cancer. It is a two step procedure: first, the patient is injected with a… …   Wikipedia

  • Solar power satellite — A solar power satellite, or SPS or Powersat, as originally proposed would be a satellite built in high Earth orbit that uses microwave power transmission to beam solar power to a very large antenna on Earth. Advantages of placing the solar… …   Wikipedia

  • microscope — /muy kreuh skohp /, n. 1. an optical instrument having a magnifying lens or a combination of lenses for inspecting objects too small to be seen or too small to be seen distinctly and in detail by the unaided eye. 2. (cap.) Astron. the… …   Universalium

  • Health and Disease — ▪ 2009 Introduction Food and Drug Safety.       In 2008 the contamination of infant formula and related dairy products with melamine in China led to widespread health problems in children, including urinary problems and possible renal tube… …   Universalium

  • Economic Affairs — ▪ 2006 Introduction In 2005 rising U.S. deficits, tight monetary policies, and higher oil prices triggered by hurricane damage in the Gulf of Mexico were moderating influences on the world economy and on U.S. stock markets, but some other… …   Universalium

  • Physical Sciences — ▪ 2009 Introduction Scientists discovered a new family of superconducting materials and obtained unique images of individual hydrogen atoms and of a multiple exoplanet system. Europe completed the Large Hadron Collider, and China and India took… …   Universalium

  • Inertial confinement fusion — (ICF) is a process where nuclear fusion reactions are initiated by heating and compressing a fuel target, typically in the form of a pellet that most often contains a mixture of deuterium and tritium.To compress and heat the fuel, energy is… …   Wikipedia

  • National Ignition Facility — NIF s basic layout. The laser pulse is generated in the room just right of center, and is sent into the beamlines (blue) on either side. After several passes through the beamlines the light is sent into the switchyard (red) where it is aimed into …   Wikipedia

  • food preservation — Any method by which food is protected against spoilage by oxidation, bacteria, molds, and microorganisms. Traditional methods include dehydration, smoking, salting, controlled fermentation (including pickling), and candying; certain spices have… …   Universalium

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”